Ben Luc Plant (Long An): BMT’s Core Facility for Supplying High-Quality Hot Mix Asphalt in the Mekong Delta
04/12/2025
Situated on nearly 5 hectares of land, equipped with Amman technology (270 tons/hour) and a VSI crushing system, the Ben Luc Plant is a key link in BMT’s hot mix asphalt production network. With a 15,000-ton aggregate storage capacity and a fully closed operational process, the plant ensures consistent quality and timely supply for major transportation projects across the Mekong Delta.