Cau Gie – Ninh Binh Expressway
The Cau Gie – Ninh Binh Expressway is a key segment of the North–South Expressway (Eastern route), connecting Hanoi with the southern Red River Delta region. It plays a strategic role in Vietnam’s national transport network.
BMT Construction Investment Joint Stock Company was honored to be selected as the main contractor for the execution of PMB III Polymer Asphalt Concrete Course with thickness of 5cm course and the Very Thin Overlay (VTO) course. The contract value VND 100 billion, covering a 20 km stretch through Ha Nam and Ninh Binh provinces.
• The PMB III Polymer Asphalt Concrete Course with thickness of 5cm serves to increase load-bearing capacity, resist rutting and cracking, and extend pavement service life.
• The VTO course enhances skid resistance, ensuring safe vehicle operation at high speeds, especially under the humid and rainy weather conditions typical in Northern Vietnam.
With strong construction capabilities, BMT mobilized modern paving equipment, high-capacity asphalt plants, and a team of experienced engineers to execute the project on time, with top quality, and in absolute safety — meeting the strict technical requirements of the Client and the standards of a national expressway.
BMT’s involvement in the Cau Gie – Ninh Binh Expressway project once again reaffirmed its reputation, competence, and leading position in the execution of high-tech transport infrastructure works nationwide
BMT Construction Investment Joint Stock Company was honored to be selected as the main contractor for the execution of PMB III Polymer Asphalt Concrete Course with thickness of 5cm course and the Very Thin Overlay (VTO) course. The contract value VND 100 billion, covering a 20 km stretch through Ha Nam and Ninh Binh provinces.
• The PMB III Polymer Asphalt Concrete Course with thickness of 5cm serves to increase load-bearing capacity, resist rutting and cracking, and extend pavement service life.
• The VTO course enhances skid resistance, ensuring safe vehicle operation at high speeds, especially under the humid and rainy weather conditions typical in Northern Vietnam.
With strong construction capabilities, BMT mobilized modern paving equipment, high-capacity asphalt plants, and a team of experienced engineers to execute the project on time, with top quality, and in absolute safety — meeting the strict technical requirements of the Client and the standards of a national expressway.
BMT’s involvement in the Cau Gie – Ninh Binh Expressway project once again reaffirmed its reputation, competence, and leading position in the execution of high-tech transport infrastructure works nationwide
Danang - Quang Ngai Expressway
The Da Nang – Quang Ngai Expressway is the first modern expressway in Central Vietnam, spanning 139 kilometers and connecting Da Nang, Quang Nam, and Quang Ngai provinces. As part of the Eastern North–South Expressway, the route is designed for a maximum speed of 120 km/h and plays a strategic role in linking the key economic zones of the Central Region.
BMT Construction Investment Joint Stock Company was honored to participate in the project as a subcontractor for Packages A4 and A5, undertaking the complete execution of the asphalt pavement structure. The scope of work included:
Construction of hot mix asphalt pavement layers:
• 10 cm Asphalt Treated Base (ATB)
• 7 cm Asphalt Concrete Base (ACB)
• 5 cm Asphalt Concrete Surface (ACS)
3 cm Very Thin Overlay (VTO) – roughness course for enhanced surface friction
BMT mobilized modern asphalt mixing plants, specialized paving equipment, and a team of experienced engineers to deliver the project on time, ensuring high quality, safety, and compliance with international standards.
This project reaffirmed BMT’s capability in executing large-scale expressway construction and strengthened its position as a leading contractor in Vietnam’s transportation infrastructure sector.
BMT Construction Investment Joint Stock Company was honored to participate in the project as a subcontractor for Packages A4 and A5, undertaking the complete execution of the asphalt pavement structure. The scope of work included:
Construction of hot mix asphalt pavement layers:
• 10 cm Asphalt Treated Base (ATB)
• 7 cm Asphalt Concrete Base (ACB)
• 5 cm Asphalt Concrete Surface (ACS)
3 cm Very Thin Overlay (VTO) – roughness course for enhanced surface friction
BMT mobilized modern asphalt mixing plants, specialized paving equipment, and a team of experienced engineers to deliver the project on time, ensuring high quality, safety, and compliance with international standards.
This project reaffirmed BMT’s capability in executing large-scale expressway construction and strengthened its position as a leading contractor in Vietnam’s transportation infrastructure sector.
Sai Gon Bridge 2
Saigon 2 Bridge is an overpass structure built parallel to the existing Saigon Bridge, located on Hanoi Highway – the arterial traffic route at the eastern gateway of Ho Chi Minh City. The project has a total length of nearly 1 km, designed with 4 automobile lanes and 1 mixed-use lane, with an operating speed of 80 km/h.
BMT Construction Investment Joint Stock Company is honored to be the supplier and constructor of hot mix asphalt for the project, executing high-specification pavement items, including:
• C12.5 Asphalt Concrete Layer, 5 cm thick – ensuring durability and high load-bearing capacity.
• VTO (Very Thin Overlay) Surface Course, 3 cm thick – enhancing surface friction and ensuring traffic safety under heavy traffic conditions.
All materials were produced at BMT’s modern mixing plant system, strictly quality-controlled in accordance with Class I urban bridge and road technical standards.
With an urgent construction schedule and high technical requirements, BMT's dual role as both supplier and contractor contributed significantly to the project's success, reaffirming BMT’s strong position in major transportation infrastructure projects in Ho Chi Minh City and the Southeast region.
BMT Construction Investment Joint Stock Company is honored to be the supplier and constructor of hot mix asphalt for the project, executing high-specification pavement items, including:
• C12.5 Asphalt Concrete Layer, 5 cm thick – ensuring durability and high load-bearing capacity.
• VTO (Very Thin Overlay) Surface Course, 3 cm thick – enhancing surface friction and ensuring traffic safety under heavy traffic conditions.
All materials were produced at BMT’s modern mixing plant system, strictly quality-controlled in accordance with Class I urban bridge and road technical standards.
With an urgent construction schedule and high technical requirements, BMT's dual role as both supplier and contractor contributed significantly to the project's success, reaffirming BMT’s strong position in major transportation infrastructure projects in Ho Chi Minh City and the Southeast region.
Thu Thiem Tunnel
Thu Thiem Tunnel is a national key infrastructure project, connecting District 1 city center with the Thu Thiem New Urban Area (Thu Duc City) via Mai Chi Tho – Vo Van Kiet Boulevard. This is the first submerged tunnel in Vietnam, applying modern immersed tunnel technology, with a total length of nearly 1.5 km, 6 traffic lanes, and a design speed of 60 km/h.
BMT Construction Investment Joint Stock Company is honored to be the supplier and direct contractor for all hot mix asphalt pavement works inside and outside the tunnel.
The asphalt mixtures were designed to meet special-class urban technical standards, capable of bearing heavy loads, resisting rutting, and ensuring smoothness and safety under continuous, high-density traffic conditions.
All materials were produced at BMT’s state-of-the-art asphalt mixing plants and subjected to strict quality control, from mix design to field execution, ensuring compliance with the rigorous technical requirements of a high-profile infrastructure project in the heart of Ho Chi Minh City.
BMT’s participation in the construction of this iconic traffic project not only affirms the company’s in-depth capabilities in asphalt pavement supply and construction, but also marks a significant milestone in establishing BMT’s brand reputation in landmark national infrastructure projects.
BMT Construction Investment Joint Stock Company is honored to be the supplier and direct contractor for all hot mix asphalt pavement works inside and outside the tunnel.
The asphalt mixtures were designed to meet special-class urban technical standards, capable of bearing heavy loads, resisting rutting, and ensuring smoothness and safety under continuous, high-density traffic conditions.
All materials were produced at BMT’s state-of-the-art asphalt mixing plants and subjected to strict quality control, from mix design to field execution, ensuring compliance with the rigorous technical requirements of a high-profile infrastructure project in the heart of Ho Chi Minh City.
BMT’s participation in the construction of this iconic traffic project not only affirms the company’s in-depth capabilities in asphalt pavement supply and construction, but also marks a significant milestone in establishing BMT’s brand reputation in landmark national infrastructure projects.
Phu My Bridge
Phu My Bridge is a large, modern cable-stayed bridge spanning the Saigon River, connecting District 7 with Thu Duc City (formerly District 2). The bridge plays a strategic role in Ho Chi Minh City’s Ring Road No.2, providing direct linkage between industrial zones, Cat Lai Port, and the inter-regional traffic corridors of the Eastern and Western economic zones.
The bridge has a total length of over 2 km, consists of 6 traffic lanes, a design speed of 80 km/h, and a navigational clearance of up to 45 meters, meeting high technical requirements for accommodating heavy transport volumes and large vessels on the river.
BMT Construction Investment Joint Stock Company is honored to have participated in the project as the supplier and direct contractor of high-quality hot mix asphalt for the entire bridge deck and approach roads at both ends.
All asphalt materials were produced at BMT’s modern mixing plants and subjected to strict quality control in accordance with the project’s technical specifications.
The successful execution of key asphalt pavement works on Phu My Bridge – one of Ho Chi Minh City’s landmark infrastructure projects – continues to affirm BMT’s technical expertise and solid position in the field of urban and national transport infrastructure.
The bridge has a total length of over 2 km, consists of 6 traffic lanes, a design speed of 80 km/h, and a navigational clearance of up to 45 meters, meeting high technical requirements for accommodating heavy transport volumes and large vessels on the river.
BMT Construction Investment Joint Stock Company is honored to have participated in the project as the supplier and direct contractor of high-quality hot mix asphalt for the entire bridge deck and approach roads at both ends.
All asphalt materials were produced at BMT’s modern mixing plants and subjected to strict quality control in accordance with the project’s technical specifications.
The successful execution of key asphalt pavement works on Phu My Bridge – one of Ho Chi Minh City’s landmark infrastructure projects – continues to affirm BMT’s technical expertise and solid position in the field of urban and national transport infrastructure.