Outstanding projects

Hanoi – Hai Phong Expressway

Hanoi – Hai Phong Expressway

The Hanoi – Hai Phong Expressway is one of the most modern and aesthetically impressive expressways in Vietnam. Designed to international standards, the route features six main traffic lanes and two emergency lanes, with a design speed of up to 120 km/h. This expressway serves as a key arterial link between the capital city of Hanoi, the Hai Phong seaport, and the Northern Key Economic Region.

BMT Construction Investment Joint Stock Company was honored to be selected as the main contractor for pavement construction on a section exceeding 70 kilometers, running through Hai Duong Province and Hai Phong City.

The pavement works carried out by BMT included:

PMB III Polymer Asphalt Concrete Course with thickness of 5cm, serving as the primary load-bearing course, enhancing rutting resistance and extending pavement lifespan.
Asphalt Concrete Roughness Course, designed to improve skid resistance and surface friction, ensuring safety at high speeds.

Accounting for 70% of the total polymer asphalt volume across the project, BMT mobilized:

A system of three high-capacity asphalt mixing plants,
Four modern specialized paving equipment lines,
A dedicated team of experts, engineers, technicians, and skilled workers to ensure uninterrupted, safe, and efficient construction operations meeting tight timelines and stringent quality requirements set by the project owner.

BMT was one of the first contractors in the industry to offer a 5-year construction warranty. To now over 10 years since completion, the pavement section constructed by BMT continues to maintain its excellent condition—with a smooth surface, no major defects, and outstanding safety for all vehicles in operation.

The Hanoi – Hai Phong Expressway marks a significant milestone in the brand development journey of BMT. As a Southern-based enterprise, BMT has left a strong impression on one of the nation’s key infrastructure projects in the North, affirming its reputation, technical capacity, and national brand stature across Vietnam.
See details
Ho Chi Minh City – Trung Luong Expressway

Ho Chi Minh City – Trung Luong Expressway

The Ho Chi Minh City – Trung Luong Expressway is the first expressway in Vietnam, playing a strategic role in connecting the Southern Key Economic Region with the Mekong Delta.

BMT Construction and Investment Joint Stock Company was honored to be the designated contractor from the early stage of the project, affirming its capability and reputation in the field of high-standard transportation infrastructure construction.

In addition, BMT was selected to carry out the repair of all pavement damages on the Ho Chi Minh City – Trung Luong Expressway. In this project, BMT pioneered the application of VTO (Very Thin Overlay) technology – a new and modern solution replacing the conventional NovaChip method, aiming to strengthen the pavement effectively, reduce costs, and extend service life.

The entire repair project was completed by BMT on schedule, ensuring technical quality and traffic standards, contributing to the early reopening of the expressway, meeting the strict requirements of the investor and serving the increasing travel demand of the public.
See details
Ho Chi Minh City – Long Thanh – Dau Giay Expressway Project

Ho Chi Minh City – Long Thanh – Dau Giay Expressway Project

The Ho Chi Minh City – Long Thanh – Dau Giay Expressway is one of the most critical expressways in the Southern Key Economic Region, connecting Ho Chi Minh City with Dong Nai Province and Long Thanh International Airport. This project is also considered one of the most modern and technically demanding transportation infrastructures in Vietnam, with a design speed of up to 120 km/h.
BMT construction investment joint stock company is proud to participate in the project as the contractor responsible for supplying and constructing the pavement structure, implementing all high-performance asphalt concrete layers, including:
• ATB (Asphalt Treated Base)
• ACB (Asphalt Concrete Base)
• ACS (Asphalt Concrete Surface)
• ACR (Asphalt Concrete Roughness)
With asphalt concrete production volume accounting for more than 90% of the project’s total, BMT reaffirmed its position as a leading company in asphalt concrete production and paving in Vietnam.
The technical highlight of the project is the application of PMB1 polymer-modified asphalt concrete for the ACR top layer – the surface layer in direct contact with vehicle tires – to:
• Improve surface adhesion and skid resistance
• Enhance traffic safety at high speeds (up to 120 km/h)
• Prolong the service life of the pavement
• Ensure operational efficiency in Vietnam’s tropical humid climate
The project was completed by BMT on schedule, meeting all high technical standards, and contributing to the overall success of this strategic expressway.
See details
Ben Luc – Long Thanh Expressway

Ben Luc – Long Thanh Expressway

The Ben Luc – Long Thanh Expressway is one of Vietnam’s national key infrastructure projects, with a total length of nearly 58 kilometers. It connects the Mekong Delta with the Southeast region without passing through the inner city of Ho Chi Minh City. This expressway plays a strategic role in the inter-regional traffic network and links directly to major transportation axes such as Ring Road 3, Long Thanh International Airport, the HCMC – Trung Luong Expressway, and the HCMC – Long Thanh – Dau Giay Expressway.
BMT Construction Investment Joint Stock Company is proud to be both the supplier of hot mix asphalt (HMA) and the contractor responsible for pavement works on several critical packages of this project. The asphalt products manufactured and supplied by BMT include:
• ATB (Asphalt Treated Base)
• ACB (Asphalt Concrete Binder Course)
• ACS (Asphalt Concrete Surface Course)
• VTO (Very Thin Overlay – Roughness Course)
All materials are produced at BMT’s modern asphalt mixing plants and strictly quality-controlled in compliance with the technical standards of the project.
In addition to supplying materials, BMT directly executed pavement construction for several key work packages, including A5, A7, A1, and J2, all of which involved high-volume output and strict technical specifications.
By simultaneously taking on both roles – material supplier and construction contractor – BMT has demonstrated its comprehensive capabilities in transportation infrastructure and reaffirmed its solid position in national-level strategic projects.
See details
Trung Luong - My Thuan Expressway

Trung Luong - My Thuan Expressway

The Trung Luong – My Thuan Expressway is a vital arterial road stretching over 51 kilometers, passing through five districts of Tien Giang Province. It plays a strategic role in connecting Ho Chi Minh City with the Mekong Delta region and significantly easing traffic congestion on National Highway 1A – the busiest roadway in Vietnam.
The project was developed under a Public–Private Partnership (PPP) model in the form of a BOT contract, with a total construction cost for phase 1 exceeding VND 12,000 billion.
BMT Construction Investment Joint Stock Company is one of the three main investors, contributing over 10% of the total capital. In addition to its investment role, BMT directly executed several major work packages of the project, with a total contract value of over VND 600 billion.
BMT's scope of work includes:
• Soft ground treatment
• Roadbed and pavement construction
• Construction of overpass bridge structures
All packages undertaken by BMT met strict technical and aesthetic requirements, making a significant contribution to the project’s progress and ensuring the overall quality of the expressway upon commissioning.
See details

Typical projects

Cau Gie – Ninh Binh Expressway

Cau Gie – Ninh Binh Expressway

The Cau Gie – Ninh Binh Expressway is a key segment of the North–South Expressway (Eastern route), connecting Hanoi with the southern Red River Delta region. It plays a strategic role in Vietnam’s national transport network.
BMT Construction Investment Joint Stock Company was honored to be selected as the main contractor for the execution of PMB III Polymer Asphalt Concrete Course with thickness of 5cm course and the Very Thin Overlay (VTO) course. The contract value VND 100 billion, covering a 20 km stretch through Ha Nam and Ninh Binh provinces.
• The PMB III Polymer Asphalt Concrete Course with thickness of 5cm serves to increase load-bearing capacity, resist rutting and cracking, and extend pavement service life.
• The VTO course enhances skid resistance, ensuring safe vehicle operation at high speeds, especially under the humid and rainy weather conditions typical in Northern Vietnam.
With strong construction capabilities, BMT mobilized modern paving equipment, high-capacity asphalt plants, and a team of experienced engineers to execute the project on time, with top quality, and in absolute safety — meeting the strict technical requirements of the Client and the standards of a national expressway.
BMT’s involvement in the Cau Gie – Ninh Binh Expressway project once again reaffirmed its reputation, competence, and leading position in the execution of high-tech transport infrastructure works nationwide
Danang - Quang Ngai Expressway

Danang - Quang Ngai Expressway

The Da Nang – Quang Ngai Expressway is the first modern expressway in Central Vietnam, spanning 139 kilometers and connecting Da Nang, Quang Nam, and Quang Ngai provinces. As part of the Eastern North–South Expressway, the route is designed for a maximum speed of 120 km/h and plays a strategic role in linking the key economic zones of the Central Region.

BMT Construction Investment Joint Stock Company was honored to participate in the project as a subcontractor for Packages A4 and A5, undertaking the complete execution of the asphalt pavement structure. The scope of work included:

Construction of hot mix asphalt pavement layers:
• 10 cm Asphalt Treated Base (ATB)
• 7 cm Asphalt Concrete Base (ACB)
• 5 cm Asphalt Concrete Surface (ACS)

3 cm Very Thin Overlay (VTO) – roughness course for enhanced surface friction

BMT mobilized modern asphalt mixing plants, specialized paving equipment, and a team of experienced engineers to deliver the project on time, ensuring high quality, safety, and compliance with international standards.

This project reaffirmed BMT’s capability in executing large-scale expressway construction and strengthened its position as a leading contractor in Vietnam’s transportation infrastructure sector.
Sai Gon Bridge 2

Sai Gon Bridge 2

Saigon 2 Bridge is an overpass structure built parallel to the existing Saigon Bridge, located on Hanoi Highway – the arterial traffic route at the eastern gateway of Ho Chi Minh City. The project has a total length of nearly 1 km, designed with 4 automobile lanes and 1 mixed-use lane, with an operating speed of 80 km/h.
BMT Construction Investment Joint Stock Company is honored to be the supplier and constructor of hot mix asphalt for the project, executing high-specification pavement items, including:
• C12.5 Asphalt Concrete Layer, 5 cm thick – ensuring durability and high load-bearing capacity.
• VTO (Very Thin Overlay) Surface Course, 3 cm thick – enhancing surface friction and ensuring traffic safety under heavy traffic conditions.
All materials were produced at BMT’s modern mixing plant system, strictly quality-controlled in accordance with Class I urban bridge and road technical standards.
With an urgent construction schedule and high technical requirements, BMT's dual role as both supplier and contractor contributed significantly to the project's success, reaffirming BMT’s strong position in major transportation infrastructure projects in Ho Chi Minh City and the Southeast region.
Thu Thiem Tunnel

Thu Thiem Tunnel

Thu Thiem Tunnel is a national key infrastructure project, connecting District 1 city center with the Thu Thiem New Urban Area (Thu Duc City) via Mai Chi Tho – Vo Van Kiet Boulevard. This is the first submerged tunnel in Vietnam, applying modern immersed tunnel technology, with a total length of nearly 1.5 km, 6 traffic lanes, and a design speed of 60 km/h.

BMT Construction Investment Joint Stock Company is honored to be the supplier and direct contractor for all hot mix asphalt pavement works inside and outside the tunnel.
The asphalt mixtures were designed to meet special-class urban technical standards, capable of bearing heavy loads, resisting rutting, and ensuring smoothness and safety under continuous, high-density traffic conditions.

All materials were produced at BMT’s state-of-the-art asphalt mixing plants and subjected to strict quality control, from mix design to field execution, ensuring compliance with the rigorous technical requirements of a high-profile infrastructure project in the heart of Ho Chi Minh City.

BMT’s participation in the construction of this iconic traffic project not only affirms the company’s in-depth capabilities in asphalt pavement supply and construction, but also marks a significant milestone in establishing BMT’s brand reputation in landmark national infrastructure projects.
Phu My Bridge

Phu My Bridge

Phu My Bridge is a large, modern cable-stayed bridge spanning the Saigon River, connecting District 7 with Thu Duc City (formerly District 2). The bridge plays a strategic role in Ho Chi Minh City’s Ring Road No.2, providing direct linkage between industrial zones, Cat Lai Port, and the inter-regional traffic corridors of the Eastern and Western economic zones.
The bridge has a total length of over 2 km, consists of 6 traffic lanes, a design speed of 80 km/h, and a navigational clearance of up to 45 meters, meeting high technical requirements for accommodating heavy transport volumes and large vessels on the river.
BMT Construction Investment Joint Stock Company is honored to have participated in the project as the supplier and direct contractor of high-quality hot mix asphalt for the entire bridge deck and approach roads at both ends.
All asphalt materials were produced at BMT’s modern mixing plants and subjected to strict quality control in accordance with the project’s technical specifications.
The successful execution of key asphalt pavement works on Phu My Bridge – one of Ho Chi Minh City’s landmark infrastructure projects – continues to affirm BMT’s technical expertise and solid position in the field of urban and national transport infrastructure.