Completing Cau Phuoc Khanh with a rough VTO asphalt concrete layer
01/08/2026
After the main span was connected, Phuoc Khanh Bridge is now entering the stage of finishing the bridge deck with the VTO textured asphalt layer – the final surface layer before the project is put into use. This part is being directly handled by BMT E&C, marking an important step forward in the bridge's completion process.