- Project
- Thu Thiem Tunnel
Thu Thiem Tunnel
| Introduce | Thu Thiem Tunnel is a national key infrastructure project, connecting District 1 city center with the Thu Thiem New Urban Area (Thu Duc City) via Mai Chi Tho – Vo Van Kiet Boulevard. This is the first submerged tunnel in Vietnam, applying modern immersed tunnel technology, with a total length of nearly 1.5 km, 6 traffic lanes, and a design speed of 60 km/h. BMT Construction Investment Joint Stock Company is honored to be the supplier and direct contractor for all hot mix asphalt pavement works inside and outside the tunnel. All materials were produced at BMT’s state-of-the-art asphalt mixing plants and subjected to strict quality control, from mix design to field execution, ensuring compliance with the rigorous technical requirements of a high-profile infrastructure project in the heart of Ho Chi Minh City. BMT’s participation in the construction of this iconic traffic project not only affirms the company’s in-depth capabilities in asphalt pavement supply and construction, but also marks a significant milestone in establishing BMT’s brand reputation in landmark national infrastructure projects. |
| Location | TP.HCM |
| Length | 22 Km |
| Scale | Speed: 80 km/h |
Other projects
Hanoi – Hai Phong Expressway
Ho Chi Minh City – Trung Luong Expressway
Ho Chi Minh City – Long Thanh – Dau Giay Expressway Project
Cau Gie – Ninh Binh Expressway
Danang - Quang Ngai Expressway
Ben Luc – Long Thanh Expressway
Trung Luong - My Thuan Expressway
Sai Gon Bridge 2


